Blog  ›  Operations
Operations

New Hire IT Equipment Checklist for Day One

A new hire IT equipment checklist has four parts: what to order before the start date, what to configure and record before handover, what to hand over on day one, and what to confirm in the first week. Done in that order, the new hire logs in at 9am with a working laptop, and you hold an assigned, serialised record from the first minute instead of rebuilding it from emails months later.

IA
InventorIA Team
Oct 1, 2026 · 7 min read
In short

What should be in a day-one IT kit?

Keep the kit short and the same for every role, then add items by exception. A standard kit is easier to order, easier to stock and easier to audit than a custom one for every hire.

ItemWhy it is in the kitWhat to record
LaptopThe main work deviceSerial number, asset tag, model, warranty end
Charger and cableThe laptop is useless without itCount it with the laptop, no separate record needed
Monitor and dockOffice desks and many hybrid setupsSerial number and asset tag for each, since they are worth chasing
Keyboard and mouseDaily comfortQuantity only, unless your policy says otherwise
Headset or webcamCalls from the first morningQuantity, or a record if you track above a value threshold
Security key or MFA tokenIdentity credential, so a lost one must be revokedSerial number and the person it is issued to
Phone or SIM, if the role needs oneReachability and two-factor codesNumber, device serial, carrier contract

Accounts are not hardware, but they belong on the same checklist: email, single sign-on, the chat tool and the licences the role needs. Our guide to the remote employee equipment process covers the shipping side.

What do you do before the start date?

Most day-one failures are decided in the week before. Work backwards from the start date.

  1. Confirm the start date, the role and the work location with HR in writing.
  2. Order from the standard kit list, or pull from stock, and note the expected delivery date.
  3. Reserve the asset tag and the licences the role needs before the hardware arrives.
  4. When the hardware arrives, capture the serial number by scan or import, never by hand. The method is in asset serial number tracking without typing.
  5. Enrol the device in your management tool, install the standard software and update the operating system.
  6. Wipe-test the setup by logging in as the new hire would, with a test account if you have one.
  7. Package the kit, or stage it on a desk, with a printed one-page guide for the first login.

How do you hand over the kit on day one?

The handover is a short, fixed routine. A checklist keeps it the same for the tenth hire as for the first.

What do you record for each item?

One record per item, filled in at the time, not later. Controls frameworks treat an accurate list of enterprise assets as the starting point, for example CIS Control 1, inventory and control of enterprise assets. A day-one record needs only a few fields:

InventorIA keeps these on the hardware register, with assignment, status, warranty and location on every asset, and imports a CSV so you can load a delivery in one go. You can look at the layout in the live demo.

What do you confirm in the first week?

Handover is not the end of onboarding. A short check a few days in catches the problems nobody mentions on day one.

How do you make onboarding match offboarding?

The easiest offboarding is the one where the return list already exists. If the day-one record lists every item, tag and serial the person received, then your IT offboarding checklist only has to read that list back and tick each item off. Without it, you are guessing what a leaver should return.

Treat the two as one cycle. Anything issued at onboarding is recovered, wiped and either restocked or retired at offboarding, as described in IT asset disposal and data wiping certificates. To start with a register that already supports this, create a workspace and import your current list.

Frequently asked questions

What should a new hire IT equipment checklist include?

The hardware in the standard kit, the accounts and licences the role needs, a configuration and record step before handover, a signed acknowledgement on day one, and a first-week check that everything works and matches the register.

How early should you order equipment for a new hire?

As early as the offer is accepted, and at least a week before the start date, so that a delayed delivery or a faulty device is found before the new hire is waiting.

Do you need a signed acknowledgement for equipment?

It is not a legal requirement everywhere, but it is good practice: it shows who received what and when, and it gives you a clear basis for the return conversation at offboarding. Check local employment rules if you are unsure.

Who should own the onboarding kit record?

One named person in IT or operations owns it, and the register is the single source. HR supplies the start date and role, IT supplies the hardware and the record.

Start every hire with a record

Assign each item to the new hire at handover, and offboarding gets a ready-made return list.

Try the live demo →